Skip to content

writing-plans

The spec-to-plan bridge. Routed to by /feature once the brainstormed spec is approved, and by /sprint before execution. Decomposes the spec into 2–5 minute tasks, each carrying its exact file path(s) and a concrete verification step that maps to a tdd obligation. Writes the plan to .codearbiter/plans/.md, ordered with dependencies flagged and an MVP slice identifiable. Nothing executes until every task has a path and a verification and the task set covers every acceptance criterion.

This is the bridge between an approved spec and something the implementation engine can actually execute. The feature command routes here once a spec is approved, and an autonomous sprint routes here before execution begins. It breaks the spec into small, individually verifiable tasks — each with an exact file path and a concrete verification step — orders them by dependency, and proves every acceptance criterion is covered before the plan is written.

  1. Pull each acceptance criterion out of the spec word for word and give it a stable ID.
  2. Break the work into small tasks, each carrying an exact path, a concrete verification step, the test-first obligation it maps to, and the criteria it advances.
  3. Order the tasks by dependency and mark the minimal shippable slice within them.
  4. Cross-check coverage both ways so nothing goes untested and nothing is added for no reason, then write the finished plan to disk with every task’s status initialized as pending.

A finished plan clears the path to either the checkpointed batch coordinator or the autonomous implementation engine, which route every task through the test-first gate — this skill never hands off to that gate directly. An uncovered criterion, or a task with no path or verification step, keeps the plan from being written at all.

GateWhenEffect
bijective coveragebefore the plan is written to diskevery acceptance criterion must map to at least one task, and every task must advance at least one criterion — a task covering nothing is scope creep and is cut
Source — plugins/ca/skills/writing-plans/SKILL.md (v2.9.1)
---
name: writing-plans
description: The spec-to-plan bridge. Routed to by /feature once the brainstormed spec is approved, and by /sprint before execution. Decomposes the spec into 2–5 minute tasks, each carrying its exact file path(s) and a concrete verification step that maps to a tdd obligation. Writes the plan to .codearbiter/plans/<slug>.md, ordered with dependencies flagged and an MVP slice identifiable. Nothing executes until every task has a path and a verification and the task set covers every acceptance criterion.
---
# writing-plans
Turn an approved spec into an executable plan. Routed to by `/feature` (after spec approval) and `/sprint`.
## Pre-flight
Read these, or STOP and surface the gap — never plan against an unapproved or missing spec:
- `${CLAUDE_PROJECT_DIR}/.codearbiter/specs/<slug>.md` — the approved brainstorming spec. The single source of acceptance criteria. Absent or unapproved → STOP and route back to `/feature`.
- `${CLAUDE_PROJECT_DIR}/.codearbiter/CONTEXT.md` — the `stage:` frontmatter (the maturity value) and project context.
- `${CLAUDE_PROJECT_DIR}/.codearbiter/tech-stack.md` — file layout, build/test/lint invocations. A verification step cites a real command from here, never a guess.
- `${CLAUDE_PROJECT_DIR}/.codearbiter/coding-standards.md` — structure and naming, so a task names the right path.
**If `--farm` was requested:** check that `FARM_API_KEY` is set in the environment (or `.env` at `${CLAUDE_PLUGIN_ROOT}/tools/.env`). If absent, BLOCK immediately — cite `${CLAUDE_PLUGIN_ROOT}/includes/farm.md` for setup instructions. Do not proceed; the farm dispatcher cannot run without an API key. Model selection happens later (at dispatch time in `subagent-driven-development`), so no model research is needed here.
## Phase 1 — Criterion extraction · gate: BLOCK
Lift every acceptance criterion from the spec verbatim and assign each a stable ID (`AC-01`,
`AC-02`, …). This list is the coverage ledger for the whole plan — Phase 4 checks the task set
against it.
A criterion the spec leaves ambiguous is a `[CONFIRM-NN]` against
`${CLAUDE_PROJECT_DIR}/.codearbiter/open-questions.md` — surface it, do not invent the intent.
Gate: every acceptance criterion in the spec captured as a numbered `AC-NN`. A partial ledger does
not pass.
## Phase 2 — Task decomposition · gate: BLOCK
Break the work into the smallest honest units. Each **task** is ~2–5 minutes of work and carries:
- **id**`T-01`, `T-02`, … stable.
- **path(s)** — the exact file(s) the task touches, resolved against `coding-standards.md`. "Some files" is not a path.
- **verification** — one concrete command or observable that proves the task done (e.g., `<test cmd> -k test_token_expiry passes`, `endpoint returns 401 on missing header`). It cites a real `tech-stack.md` invocation or a directly observable behavior — never "looks right".
- **maps-to** — the `tdd` obligation this verification corresponds to. The verification *maps to* a tdd obligation; it does NOT replace tdd's own gates. `tdd` Phase 1 still derives and Phase 4 still verifies obligations against passing tests.
- **covers** — the `AC-NN`(s) this task advances.
Split anything that won't fit ~5 minutes or touches unrelated paths. Reject the trap of one
monolithic "implement the feature" task — that defeats the plan.
Gate: every task has at least one path AND a verification AND a `maps-to`. A task missing any of the
three blocks the plan.
## Phase 3 — Order & MVP slice · gate: BLOCK
Order tasks so each runs only after what it depends on. Flag every dependency explicitly
(`T-07 depends on T-03`). A cycle is a decomposition error — return to Phase 2 and split.
Group the ordered tasks so the **MVP slice** is identifiable: the minimal contiguous task set that
satisfies the spec's core acceptance criteria and is shippable on its own. Everything past the slice
is incremental.
Gate: a complete dependency order with no cycle, and an explicitly marked MVP slice.
## Phase 4 — Coverage proof & write · gate: BLOCK
Cross the ledger against the task set, both directions:
- Every `AC-NN` is covered by at least one task's `covers`. An uncovered criterion blocks — author the missing task.
- Every task advances at least one `AC-NN`. A task that covers nothing is scope creep — cut it or surface it.
Then write the plan to `${CLAUDE_PROJECT_DIR}/.codearbiter/plans/<slug>.md``<slug>` matching the
spec — with the `AC-NN` ledger, the ordered task table (id · path(s) · verification · maps-to ·
covers · depends-on · **status**, initialized `PENDING`), the marked MVP slice, and any out-of-scope
item tagged inline `[NEEDS-TRIAGE]`.
The status column is the pipeline's resume ledger: `subagent-driven-development` flips a task to
`ACCEPTED` the moment it accepts it, so an interrupted run (crash, compaction, closed session) is
re-entered by `/feature` at the first non-`ACCEPTED` task instead of restarted from brainstorming.
Gate: bijective coverage proven — no criterion without a task, no task without a criterion — and the
plan written to disk. This clears the path to execution: `executing-plans` (checkpointed, via
`/feature`) or `subagent-driven-development` (autonomous, via `/sprint`) — each routes every task
through `tdd`. The plan never hands off to `tdd` directly.
### Phase 4-farm extension (only when `--farm` was requested)
When `--farm` was requested, after the bijective coverage gate passes and the `.md` plan is written,
produce the farm artifact (`plan.json`) — **one MVP slice at a time** — per
`${CLAUDE_PLUGIN_ROOT}/skills/writing-plans/references/farm-plan.md`. Load that leaf and follow it;
it owns the per-task failing-test + schema-valid `plan.json` procedure.
Gate: all failing tests written and confirmed failing; `plan.json` written and schema-valid. Both
artifacts exist before handing off to `subagent-driven-development`.
## Hard rules
- MUST NOT plan against an absent or unapproved spec — STOP and route back to `/feature`.
- MUST NOT emit a task without an exact path AND a concrete verification step.
- MUST NOT let a task's verification stand in for a `tdd` gate — it maps to a tdd obligation, it does not replace one.
- MUST NOT write the plan while any acceptance criterion is uncovered or any task covers nothing.
- MUST NOT guess a verification command — cite `tech-stack.md` or STOP.
- MUST NOT resolve an ambiguous criterion by guessing — raise a `[CONFIRM-NN]`.
- MUST NOT emit `plan.json` in `--farm` mode without writing and confirming each failing test first.
- MUST NOT set `meta.model` or `meta.apiBaseUrl` in `plan.json` — these belong to the dispatch step.
- MUST NOT proceed with `--farm` if `FARM_API_KEY` is absent — cite `${CLAUDE_PLUGIN_ROOT}/includes/farm.md` and BLOCK.
- MUST, at exit, run the follow-up harvest (`${CLAUDE_PLUGIN_ROOT}/includes/harvest.md`) over any `[NEEDS-TRIAGE]` out-of-scope items — batch-confirm promoting them to `open-tasks.md` (work) or `open-questions.md` (decisions) so they don't die in the plan file.

View in repo